| 8:00 am |
Overview of Phase 3/4 Project PDF or PPT
Introductions & Confirm Dial-In Conferencing Discussion of Workshop Organization |
| 8:15 am |
Present the context for the meeting: use of planning inventories (modeling and Regional Haze SIPs); how planning inventories fit into WRAP fire policies; desired outcome of the meeting. |
| |
Projection (2018) Prescribed (Rx)
Fire Inventory
|
| 8:45 am |
Overview of methodology used to derive initial projection scalars and fire activity levels PDF or PPT |
| 9:45 am |
Break |
| 10:00 am |
Present STRAWMAN projection scalars / activity targets (including activity projection breakdown by Projection Scenario) PDF or PPT |
| 12:00 pm |
Lunch |
| 1:00 pm |
Option - Breakout or Plenary
Could break out based on geographic locations; agency / jurisdiction; other?
WRAP Phase IV 2018 Fire Projection EI All Fire Sources (without Alaska) PDF or PPT |
| |
| Group 1 - Technical Modules and/or detailed discussions on how to revise scalars / activity targets / relative activity rates between scenarios. |
Group 2 - If group elects to break into smaller groups |
|
| 3:00 pm |
Break |
| 3:15 pm |
Prepare summary table/list of revisions to methods and revisions to activity scalars/ targets (include justifications) |
| 4:45 pm |
Daily wrap up and prepare for Day 2 |
| |
Emission Reduction Technique (ERT)
Application Rules
|
| 8:00 am |
Introductions & confirm dial-in conferencing.
|
| 8:15 am |
Present Strawman ERT Application Rules: background of ERT materials; purpose of ERT Application Rules; how rules will be implemented in database; ERT Preview Tool. PDF or PPT |
| 10:00 am |
Break and Hotel Checkout |
| 10:30 am |
Discuss and develop specific revisions (as necessary) to Strawman Application Rules; prepare final ERT Application Rules. |
| 12:00 pm |
Lunch |
| |
Roll-out of Fire Calculation Tool
|
| 1:00 pm |
Present key features and outputs of Fire Calculation Tool. PDF or PPT |
2:00 pm |
Look and feel demonstration of Fire Calculation Tool |
| 2:30 pm |
Workshop WRAP Up and Next Steps |
| |
Adjourn |